+61 2 4931 8700 info@pipelining.com.au
The Wentworth to Broken Hill Pipeline – John Holland 2018

The Wentworth to Broken Hill Pipeline – John Holland 2018

The Wentworth to Broken Hill Pipeline – John Holland 2018 The Wentworth to Broken Hill Pipeline was an initiative by the NSW State Government to supply Broken Hill with 37.4 megalitres of raw water per day via a 270km pipeline from the River Murray near...
Surat Basin Gas Pipeline – CPB 2017

Surat Basin Gas Pipeline – CPB 2017

Surat Basin Gas Pipeline – CPB 2017 Pipe Lining & Coating Pty Ltd supplied pipework and complex fittings for the trunklines for both Charlie and Phillip Pump stations. All pipework was coated in Fusionkote (AS4321) and internally cement...
Houghton Pipeline Control Tower – NQ Excavations Pty Ltd

Houghton Pipeline Control Tower – NQ Excavations Pty Ltd

Houghton Pipeline Control Tower – NQ Excavations Pty Ltd Pipe Lining & Coating supplied various pipes and fittings for the Houghton Pipeline Duplication project in Townsville. The project was to build a full functioning and sustainable 36.5km pipeline from...
Morpeth Waste Water Treatment Plant – Iplex, 2015

Morpeth Waste Water Treatment Plant – Iplex, 2015

Morpeth Waste Water Treatment Plant – Iplex, 2015 Pipe Lining and Coating Pty Ltd manufactured the fittings for the upgrade of the Morpeth Waste Water Treatment Plant. The types of fittings include complex manifolds, reducers, angled branch connections and some...