Facilities:
Address: 53 Gardiner Street, Rutherford, NSW 2320
Land Area: 2.0 and 3.0 Hectares
Factory Area:
- 10,000 square metres “under hook” floor space, fully enclosed
- 11 x roller shutter access doors
- 8 x overhead cranes 2.5, 5, 10 & 15 T capacities
Equipment:
Fabrication, Boilermaking, Welding
MIG, TIG and Sub-Arc to 600amp 100% Duty cycle.
Abrasive Blasting, Painting& Metalizing:
- 18m x 5m x 5m blast chamber.
- Air Supply – 2/1000 CFM, 280 CFM compressors
- Airless and Conventional Spray equipment including internal pipe painting systems.
- Arc Metal Spraying – 400amp – zinc, aluminium and alloys.
- 5000m² under cover painting area.
Epoxy Lining & Coating: H.P Airless application of Solventless High Build and Ultra High Build Epoxy to 3000 µm.
Cement Lining: Centrifugal Cement Lining to 3000NB, 12 metre lengths
Fusionkote: Fusion bonded medium density polyethylene coating up to DN2400 and standard 12m lengths, including all fittings both simple and complex.
Manufacture: All facets of manufacture are completed under works Inspection and Test Procedures. Fabrication (Welding) is independently inspected by NATA approved third party inspection agency.
Pipe Production line: a continuous rolled and welded pipe production, up to 2.4m diameter and up to 24m lengths.