Coombabah Sewer Treatment Plant (2021) – Acciona
Processing approximately 50% of the Gold Coast City Sewer the upgrade was a necessity to ensure the growing capacity required for the city. PLC supplied MSCL (CA Cement) Pipe & Fittings DN600 – DN1200 for the project which encountered numerous challenges that together with Acciona were overcome with ease due to the teamwork between both parties applying logic and practicality to spool configurations the result ensured a smooth installation assisting the crews onsite.