Haughton Pipeline Project (2019 to 2021) – NQ Excavations / Civil Plus / BMD (2019)
This project was a 35km pipeline installation to ensure water security to support the Ross River Dam water catchment by providing greater capacity to transfer raw water into the dam to top up the system in low rainfall periods. PLC manufactured and supplied all 3 contractors awarded the separable portions of the project with MSCL Pipe & Fittings for all Control Towers and Valve Pit areas; our supply consisted of DN1800 and DN1400 fittings.